Unboxing and Setup Cables - Colibri Evaluation Board
Overview
In this first lesson, you will go through the process of unpacking your system on module and carrier board and assembling the hardware.
A block diagram of the system setup and its connections is presented below for reference.
Prerequisites
Step 1
1.1 Remove the Evaluation Board and the Colibri System on Module from the blisters.
Step 2
2.1 Plug a VGA monitor into X24.
2.2 Plug an Ethernet cable into X17.
2.3 Plug a USB keyboard into X32.
2.4 Plug a USB Type-B to Type-A cable into X27.
2.5 Plug a USB Type-B to Type-A cable into X29 if you want to enter Recovery Mode and load the Toradex Easy Installer.
2.6 Plug a power supply into the barrel jack X35.
Double-check that your power supply is within the rating board limits (7-27V for the X15 connector or 12V for the X17 connector) and that the polarity is not reversed. Also, ensure the power supply's current capacity is sufficient, or the system may shut down unexpectedly. For evaluation purposes, a 12V 2A power supply is recommended.
2.7 Make sure that the jumpers JP19 and JP17 are set to USB mode as shown in the image below, once we will use UART A via the USB Type-B connector X27.